Residential stands planned
Approximate planned inventory; not current availability
A phased mixed-use development planned for Chipinge, with residential stands and supporting commercial, industrial, institutional and community uses.
Galilee Properties is desirous of transforming a farm known as The Nest of Kenilworth into a phased mixed-use development by the name The Nest Chipinge, comprising high- medium- and low-density residential stands with supporting commercial, industrial, institutional and community uses. The Nest of Chipinge is planned across six phases. Published inventory and progress are shown only after administrative review and remain subject to confirmation.
Approximate planned inventory; not current availability
Configurable phased structure
Subdivision permit DP02/2024, reportedly issued 15 November 2024. Development permit reportedly issued by Chipinge Town Council on 18 December 2025. These supplied references do not prove current completion.
Detailed scope and release information will be published after approval.
0% approved project-reported progress
Explore phaseDetailed scope and release information will be published after approval.
Explore phaseDetailed scope and release information will be published after approval.
Explore phaseDetailed scope and release information will be published after approval.
Explore phaseDetailed scope and release information will be published after approval.
Explore phaseThese records do not claim current physical completion. Uploaded photographs do not determine infrastructure completion; only administratively approved status information is shown.
The plan describes access from an existing state road through a proposed 18-metre road, with a second planned 25-metre access between Homefields and Chipinge Township Reserves.
Planning context: Planned
The short-term concept uses 12 existing boreholes and an existing reservoir. Borehole capacity testing is still required to confirm yield and final requirements.
Planning context: Technical Verification Required
The plan sets aside 1.6388 hectares for sewer treatment ponds and requires the treatment system to be designed in accordance with applicable EMA standards.
Planning context: Design Requirement
The planned supply depends on the capacity of the existing Chipinge electricity network.
Planning context: Capacity Dependent
Road and storm-water works are planned in line with the development permit, including surfaced roads.
Planning context: Planned
01 Jul 2026 – 31 Aug 2026
test
70% approved project-reported progress
The Nest of Chipinge. Exact coordinates and an interactive map will appear only when approved.
Availability, prices, documentation and site-visit arrangements remain subject to confirmation.
These supplied planning extracts are visual references. Final boundaries, availability and release details remain subject to authorised confirmation.
Recent supplied footage provides visual context alongside formally reviewed progress reporting.